之前发的一篇文章,创建生产订单的BAPI:BAPI_PRODORD_CREATE,根据订单类型的计划参数配置,可以按计划生产日期进行创建,原文:《Create production order Scheduled based on production date》
解决方法是NOTES:<1956185 - Create order using BAPI: Scheduling of production dates>
与之相关的修改生产订单的BAPI:BAPI_PRODORD_CHANGE,如果也需要修改计划生产日期,也需要打另外一个NOTES:<2532849 - Change order using BAPI: Scheduling of production dates>:
After you implement this special development, the dates transferred during the BAPI call are no longer interpreted as basic dates but as production dates (scheduled dates) when the "Scheduling based on production dates" indicator is set.
也就是说,打上这个note之后,如果生产计划参数文件中,勾选了按生产日期,那么BAPI中的参数的基本开始/完成日期对应修改的就是生产订单的计划开始/完成日期。