首页
学习
活动
专区
圈层
工具
发布
首页
学习
活动
专区
圈层
工具
MCP广场
社区首页 >专栏 >【POJ】1287 - Networking(最小生成树(克鲁斯塔尔),水)

【POJ】1287 - Networking(最小生成树(克鲁斯塔尔),水)

作者头像
FishWang
发布2025-08-26 19:35:39
发布2025-08-26 19:35:39
10600
代码可运行
举报
运行总次数:0
代码可运行

Networking

Time Limit: 1000MS

Memory Limit: 10000K

Total Submissions: 7698

Accepted: 4216

Description

You are assigned to design network connections between certain points in a wide area. You are given a set of points in the area, and a set of possible routes for the cables that may connect pairs of points. For each possible route between two points, you are given the length of the cable that is needed to connect the points over that route. Note that there may exist many possible routes between two given points. It is assumed that the given possible routes connect (directly or indirectly) each two points in the area. Your task is to design the network for the area, so that there is a connection (direct or indirect) between every two points (i.e., all the points are interconnected, but not necessarily by a direct cable), and that the total length of the used cable is minimal.

Input

The input file consists of a number of data sets. Each data set defines one required network. The first line of the set contains two integers: the first defines the number P of the given points, and the second the number R of given routes between the points. The following R lines define the given routes between the points, each giving three integer numbers: the first two numbers identify the points, and the third gives the length of the route. The numbers are separated with white spaces. A data set giving only one number P=0 denotes the end of the input. The data sets are separated with an empty line. The maximal number of points is 50. The maximal length of a given route is 100. The number of possible routes is unlimited. The nodes are identified with integers between 1 and P (inclusive). The routes between two points i and j may be given as i j or as j i.

Output

For each data set, print one number on a separate line that gives the total length of the cable used for the entire designed network.

Sample Input

代码语言:javascript
代码运行次数:0
运行
复制
1 0

2 3
1 2 37
2 1 17
1 2 68

3 7
1 2 19
2 3 11
3 1 7
1 3 5
2 3 89
3 1 91
1 2 32

5 7
1 2 5
2 3 7
2 4 8
4 5 11
3 5 10
1 5 6
4 2 12

0

Sample Output

代码语言:javascript
代码运行次数:0
运行
复制
0
17
16
26

Source

Southeastern Europe 2002

用克鲁斯塔尔算,不难的最小生成树的题。

代码如下:

代码语言:javascript
代码运行次数:0
运行
复制
#include <stdio.h>
#include <algorithm>
using namespace std;

struct node
{
	int st,end,cost;
}a[2500];		//记录每一条路 

int pp[55];

bool cmp(node a,node b)		//按花销从小到大排序 
{
	return a.cost<b.cost;
}

int find(int x)
{
	int r=x;
	while (r!=pp[r])
		r=pp[r];
	int j=x;
	int t;
	while (pp[j]!=r)
	{
		t=pp[j];
		pp[j]=r;
		j=t;
	}
	return r;
}
int join(int x,int y)
{
	int fx,fy;
	fx=find(x);
	fy=find(y);
	if (fx!=fy)
	{
		pp[fx]=fy;
		return 1;		//不一棵树返回1 
	}
	return 0;
}

int main()
{
	int p,r;		//点,路线数
	int ans;
	int num;		//完成连接的数量,等于p-1时终止 
	while (~scanf ("%d",&p) && p)
	{
		scanf ("%d",&r);
		//首先初始化
		for (int i=1;i<=p;i++)
		{
			pp[i]=i;
		}
		ans=0;
		num=0;
		//输入
		for (int i=0;i<r;i++)
		{
			scanf ("%d %d %d",&a[i].st,&a[i].end,&a[i].cost);
		}
		if (p==1)
		{
			printf ("0\n");
			continue;
		}
		sort (a,a+r,cmp);		//花费从小到大排序
		for (int i=0;i<r;i++)
		{
			if (join(a[i].st,a[i].end))
			{
				ans+=a[i].cost;
				num++;
			}
			if (num==p-1)
				break;
		}
		printf ("%d\n",ans);
	}
	return 0;
}
本文参与 腾讯云自媒体同步曝光计划,分享自作者个人站点/博客。
原始发表:2025-08-26,如有侵权请联系 cloudcommunity@tencent.com 删除

本文分享自 作者个人站点/博客 前往查看

如有侵权,请联系 cloudcommunity@tencent.com 删除。

本文参与 腾讯云自媒体同步曝光计划  ,欢迎热爱写作的你一起参与!

评论
登录后参与评论
0 条评论
热度
最新
推荐阅读
领券
问题归档专栏文章快讯文章归档关键词归档开发者手册归档开发者手册 Section 归档